top of page

Fieldwork 1

On the 20th of November, we are required to do the 1st fieldwork of site surveying which is auto-leveling around campus. This fieldwork required 4 to 5 person in a group. I learned how to have teamwork with my group member in collecting data. Not only that, this fieldwork give me better understanding about leveling which I have never ever experiences before real life. Moreover, this is very interesting because I also learn how to use the apparatus and equipment which taught by the lecturer in lecture class. This would give me adequate idea about how a land surveyor do leveling in site.

 

 

 

 

Data collection did for the fieldwork

This is the compile version of fieldwork report 1.

Copyright © 2013 by YAP ZHI XIN. All Rights Reserved

  • s-facebook
  • Twitter Metallic
bottom of page