We are given a group assignment in measuring all the elements in the terrace house project (Block I) in a group of 5. There are 9 blocks of terrace house in total.

Things needed to measure are:

- Excavations & Pad Footing

- Ground Floor Slabs & Excavations

- Ground Floor Beams, Excavations & Apron Slabs

- Roof Beam & Slab

- Column Stump, Column & Upper Roof Beams

 

I was assigned to measure Ground Floor Slab & Excavations which is given period of one month to complete. 

Plan used to measurement of excavations and ground floor slab:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Job No.   : WHA/3054/96

Job Title : Housing Estate Phase 5, 54 units Single Storey Terrace House. Lot 8159 (Tali Ayer Estate) Mukim                         Parit Buntar, Daerah Kerian, Perak Darul Ridzuan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 